Set-up times
Set-up times
ACS102 Sawing
Saw blade changeover:2 min.
Length changeover, without change of diameter range of the clamping tools:2 min.
Diameter changeover within the diameter range of the clamping tools:2 min.
Product changeover, including change of all clamping tools:7 min.
Bundle loading magazine changeover for multiple cut:5 min.